Example of F&P Service Flow

F&P’s projects can be provided from land exploration, design and management, and building management. Here, we introduce the service flow based on a “project case.”

F&P Service Model

PHASE 1
Research and Analysis
Research and Analysis Phase

This is a phase in which we draw out the intentions of our customers and decide on a major direction. We will continue to make decisions on a number of discussions. We will draw up an accurate financial plans, schedule, and construction plan based on interviews with the customer. Depending on the project, the expense of demolition will be calculated and soil contamination surveys will be conducted in parallel.

  • Sales Department
    • Logistics market research
    • Real estate surveys (including interviews with government offices)
    • Surveys of commercial areas and demand forecasting surveys(questionnaires and interviews)
    • Tenant interviews
    • Verification of the rent validity
  • Design Department
    • Planning
    • Site inspection
    • Investigation of laws and regulations
    • Preparation of presentation materials
  • Construction Department
    • Preparation of project outline schedule
    • Estimation of super-estimated costs
    • Service related with demolition of existing buildings
    • Service related with soil contamination countermeasures
  • Project Management Department
    • Preparation of long-term repair plan (summary plan)
PHASE 2
Plan
Planning Phase

This is the phase in which the selection of land is almost fixed, and are in the phase of deciding on specific business income and expenditures, business scheme, schedules, and construction plans. This is an important aspect of determining the direction of future projects and requires careful consideration of the impact on subsequent phases.

  • Sales Department
    • Logistics market research
    • Real estate surveys (including interviews with government offices)
    • Tenant interviews
    • Verification of the rent validity
  • Design Department
    • Planning
    • Site inspection
    • Investigation of laws and regulations
    • Determine specifications
    • Determine construction category
  • Construction Department
    • Preparation of project detail schedule
    • Estimation of estimated costs
    • Service related with demolition of existing buildings
    • Service related with soil contamination countermeasures
  • Administration Department
    • Contract document
    • Project budget review
    • Confirmation of laws and regulations for each transactions
  • PM Department
    • Preparation of long-term repair plan (final plan)
PHASE 3
Design
Designing Phase

This is the phase in which we grasp the customer’s intentions and design according to the law. The design department mainly leads the project. From the basic design to the implementation design, we will proceed to the building confirmation application work. In the meantime, we will hold regular meetings with related parties to deepen our discussions on the building quality.

  • Sales Department
    • Project promotion
    • Tenant interviews
  • Design Department
    • Administrative consultation
    • Development design
    • Basic design
    • Implementation design
    • Building confirmation applications
    • Adjustment of the construction scope
  • Construction Department
    • Preparation of RFP for constructor selection
    • Bid estimate assessment for constructor selection
    • Checking the design drawing
PHASE 4
Construction Supervision
Construction Supervision Phase

This is the phase when the design drawing is completed and the building is constructed based on the design drawing. The design and construction departments mainly conduct inspections to ensure that construction is carried out according to the design drawings. At regular meetings, we will proceed with the determination of more detailed specifications.

  • Sales Department
    • Project promotion
    • Tenant interviews
  • Design Department
    • Administrative consultation
    • Construction supervision (check of plan drawings, instructions, and construction drawings)
    • Adjustment of the construction scope
  • Construction Department
    • Construction supervision (confirmation of plan drawings, procedures, construction drawings, construction processes, and construction quality)
    • Adjustment of the construction scope
PHASE 5
Building Management
Building Management Phase

This is the phase in which completed buildings are managed. We will promote cleaning, legal inspections, regular maintenance, and repairs. In addition, personnel involved in design supervision will attend the one-year and two-year inspections after completion.

  • Sales Department
    • Customer satisfaction interview
    • Tenant leasing
  • Design Department
    • Attendance at inspection of one year after completion
    • Various consultation services after building operation
  • Construction Department
    • Formulation of construction costs for restoration to original state upon departure of tenant
    • Attendance at inspection of one year after completion
    • Various consultation services after building operation
  • Administration Department
    • Contract document
  • Property Management Department
    • Building maintenance planning
    • Building operation management