The construction of TC Kobelco Real Estate Co., Ltd.’s “AS-LOGI Ayase” was completed.
The construction of TC Kobelco Real Estate Co., Ltd.’s “AS-LOGI Ayase”, for which F&P provided project management services, was completed. This is the fifth facility of the AS-LOGI series and the first logistics facility in the Tokyo metropolitan area.
This facility is located at a key transportation hub where the Tomei Expressway connecting eastern and western Japan, the Ken-O Expressway covering the greater Tokyo metropolitan area, and major national highways intersect. The surrounding area features a concentration of logistics facilities, factories, and other industrial sites.
Located within approximately 40 km of central Tokyo and about 3 km from the Tomei Expressway’s “Ayase Smart IC,” this highly convenient location offers significant potential for both urban and wide-area distribution. Furthermore, situated within the Ayase Industrial Park, it provides an excellent operational environment enabling 24-hour operation.
This facility is a multi-purpose warehouse capable of dividing into up to two sections. It has obtained CASBEE Kanagawa A-rank certification and ZEB Ready certification, demonstrating its environmental considerations. Furthermore, it is equipped with a 24-hour emergency generator to support operations during power outages and includes a disaster prevention storage area, ensuring BCP support.
F&P has provided comprehensive support to realize high-quality warehouses by overseeing basic plans, basic designs, implementation design supervision, and construction supervision.
We will continue to support the creation of high-quality facilities tailored to our customers’ needs, hoping this facility will contribute to the further business development of TC Kobelco Real Estate Co., Ltd. and the tenants utilizing the facility.
Construction Summary
Client | TC Kobelco Real Estate Co., Ltd. |
---|---|
Planned Site | 8-17-1 Fukaya-kami, Ayase, Kanagawa |
Site Area | 11,529.71㎡ |
Building Area | 6,326.39㎡ | Total Floor Area | 24,907.08㎡ |
Usage | Commercial warehouse |
Structure and Scale | Steel-structure, 4-story box-type building | Construction Period | May 2024 ~ September 2025 |
![]() |