The groundbreaking ceremony of Nishi-Nippon Railroad Co. Ltd.’s rental logistics facility “MID LOGI Tosu” was held.
The groundbreaking ceremony of Nishi-Nippon Railroad Co. Ltd.’s rental logistics facility “MID LOGI Tosu”, for which F&P provides project management service, was held on September 2, 2025.
This property faces National Route 3 and is adjacent to the Tosu Interchange on the Kyushu Expressway, offering excellent access to Fukuoka, Nagasaki, Oita, and Kumamoto, making it an ideal location for a land transportation hub. Furthermore, it is located within approximately one hour’s drive of Fukuoka Airport, Kyushu Saga International Airport, and Hakata Port, offering high convenience for both air and sea transportation.
The planned building is a three-story box-type structure designed to maximize land use, taking the site’s shape into consideration. It also incorporates thoughtful exterior design and environmental considerations.
Our company has advanced this project from the initial planning stage through basic planning, basic design supervision, and implementation design supervision. Moving forward, we will also supervise construction work, providing comprehensive support for this project.
We will continue to play a part in advancing our clients’ businesses while striving to create even higher-quality facilities tailored to their needs, driving our projects forward.
Construction Summary
Client | Nishi-Nippon Railroad Co. Ltd |
---|---|
Planned Site | 598-5 Tsuchitori, Nagayoshi-machi, Tosu , Saga |
Site Area | 7,271㎡ | Total Floor Area | 10,307㎡ ※Includes office space; entire building rental assumed |
Usage | Commercial Warehouse |
Structure and Scale | Steel structure, 3-story | Construction Period | September 2025 to October 2026 (planned) |
![]() |